Details on New Feed Pipe
Information about the New Feed Pipe dialog for Radiant Heating and Cooling.
In the dialog New Feed Pipe you define which circuit is to be connected with the feed pipe and how long the feed pipe is in the selected room. The circuit to be connected does not have to be in the same room as the feed pipe.
You are here:
(Symbol Bar)
After the assignment, the feed pipe is displayed in the room view with the abbreviation Z (Code). In the pipe run view, the feed pipe between the manifold connection and the heating or cooling circuit is displayed.
in Storey/Area or Apartment
When selecting a circuit, displays the structure of the layout of the storey on which the room is located. If the room is located in an apartment or an area, the structure of this level is displayed.
in Pipe Run
When selecting a circuit, displays the entire structure of the layout with its division into pipe runs.
Length of the Feed Pipe in Current Room (single length!)
Sets the simple length (supply length only) of the supply pipe in the selected room. In combination with the selected pipe distance, the required area as well as the return water pipe is determined.