Jump directly to main navigation Jump directly to content

Setting Simultaneity for Dwelling Stations

Shows step-by-step how to set the simultaneity for dwelling stations in the project.

Before you begin

You have placed dwelling stations in the project and want to set the simultaneity.

Requirements:

All dwelling stations have been placed and connected correctly.

Navigate to:

Project tabDisciplines ...HeatingAnalyse tabConfigurations Dwelling stations ...

Applies to heating.

Procedure

  1. In the section Simultaneity approach area, select the corresponding method for determining simultaneity.
  2. Optional: If you have selected a user-defined procedure, enter a Name and the values for determining the user-defined simultaneity in the section Simultaneity.
  3. For Diagram: N enter the desired number of apartments to enable a better assessment of the selected method in the simultaneity curve.
  4. In the section Domestic hot water supply dwelling station area, define whether the dwelling stations are to be designed for Priority operation or for Parallel operation.
  5. In the section Simultaneity, choose whether you want to Round to the next higher number of devices in the calculation.
  6. If you have a buffer tank in the project, check and, if necessary, correct the value for DHW simultaneity, generator - buffer tank.

Results

The simultaneity for the dwelling stations in the project is set and is taken into account in the calculation.