The Building Detection in LINEAR Building Takes a Long Time
Problem
You prepared your model for handover to LINEAR Building and during building detection you find out that it takes a long time.
Cause: High number of enveloping surfaces bounding spaces
During the building detection process, each enveloping surface bounding the space is examined for its thermal properties. If a building/space contains a high number of space bounding enveloping surfaces, the duration of the building detection will be extended accordingly.
Solution
- Navigate to Revit and run the Check enveloping surfaces check routine in the Areas and spaces section. in
- Check the issues in the Issues and Tasks tab and follow the solutions proposed there.