Configure Ventilation at Project Level
Shows step-by-step how to set the ventilation system at the project level.
Before you begin
You would like to configure the ventilation system for your project.
Navigate to:
Procedure
- Select a ventilation system from the drop-down list.
- Enter the efficiency of the heat recovery system η value (HR).
- Enter the Design pressure difference of the GVD.
Results
The ventilation at project level is configured.