Pre-Concept Design
Learn how to collaboratively localize and dimension equipment rooms and how to create pipeline corridor concepts.
Integral planning means that even in the early planning phases, all those involved in the planning work together on the concept of the building. With our tools for planning, dimensioning and placement of equipment rooms as well as for the construction of supply pipelines, you have the possibility to optimize the installation of the planned building services in collaboration with other trades already in the preliminary planning phase. The resulting initial effort is more than compensated in subsequent planning phases by reduced friction points and shortened revision planning.