Jump directly to main navigation Jump directly to content

Copying Symbols to Another Pipe Run

Shows step-by-step how to copy symbols of your pipe run scheme to another pipe run.

Before you begin

You want to copy symbols from a pipe run scheme to another pipe run.

Navigate to:

Note: It is not possible to simultaneously copy several symbols to another pipe run.

Project - tabDisciplinePlanning type 2D Scheme PlanningCreate - tabStoreys and generatorsScheme generator, Heating/Potable water/Waste water/Gas ...

Applies to Heating, Potable water, Waste water and Gas.

Procedure

  1. Select the symbol you want to move and, holding down the left mouse button and the Ctrl key, drag it to one of the pipe run buttons at the bottom of the schematic view.

    A small plus icon appears at the cursor.

  2. Release the left mouse button over a pipe run buttons.

Results

A copy of the symbol has been placed at the same position on the same storey of the other pipe run.