Details on Pipe Run Options

Information about the dialog Pipe run options in Scheme generator for the trade Potable water.

You are here:

Project - tabDiscipline Potable waterPlanning type 2D Scheme PlanningCreate - tabStoreys and GeneratorsScheme Generator, Potable water ...Context menu of the main pipe run (right mouse click)Pipe run options...

Dialog pipe run options Linear AutoCAD

Draw regulating valves

Defines which valves are used for the pipe run.

Assignment to outlet in cellar collector

Defines which outlet of the cellar collector is assigned to the pipe run.

,

With the two buttons you can switch between different pipe runs of the scheme without having to close the dialog.