Jump directly to main navigation Jump directly to content

Details on Options

Information about the dialog Options in the scheme generator for the Potable water trade.

Clicking the Options button opens the dialog of the same name, where you can make presettings for the schema construction.

You are here:

Project - tabDiscipline Potable waterPlanning type 2D Scheme PlanningCreate - tabStoreys and GeneratorsScheme Generator, Potable water ...Options...

Options scheme generator Linear AutoCAD

Pipe run connection in the intermediate floors

Defines how the pipes are connected to the pipe run.

Connection of the consumers

Connection looped in - enabled: The cold and hot water pipes are connected looped in.

Type of installation

First, click the button to select the desired manufacturer. Then click the drop-down list to select the desired installation type.

Distance between consumers

Sets the clear distance between the consumers.