Details on Options
Information about the dialog Options in Scheme generator for the trade waste water.
Clicking the Options button opens the dialog of the same name, where you can make presettings for the schema construction.
You are here:
Connection to waste water pipe run
Determine whether the connections to the waste water pipe run are designed as single or double branches. With the setting Automatic, the connection of collector pipes or single connector pipes to the down pipe is carried out without chamfer if possible, i.e. with a 90° angle.
Sewer junction
Determines whether the sewer junction is placed under the bottom plate or under the ceiling of the lowest storey.
Distance between consumers
Sets the clear distance between the consumers.