Jump directly to main navigation Jump directly to content

Details on Settings Waste Water

Information about the Settings dialog in pipe network calculation waste water.

You are here:

AssistantsTrade / Drawing typeCalculationSettings...

The dialog is divided into following tabs:

General information

In this tab, specify global settings for the detection of components and pipes that are to be considered during calculation.

Drainage

In this tab you can determine global settings for calculation. Select the calculation method and the building type, specify minimum slope and determine global settings for technical data of toilets.

Rainfall rate

In this tab, specify all settings regarding the rainfall rate that is to be used for rain drainage.

Siphonic Drainage

In this tab, select the method of calculation and adjust other parameters if necessary.

Material

Specify which tolerances and distances are to be used when determining material.