About the Synchronization
Explains the concept of the synchronization of parameters between LINEAR Building and Revit.
During building detection or an update, calculation-relevant information is transferred between LINEAR Building and the connected CAD in LIN parameters. As the parameter values can be defined both on the CAD side and in LINEAR Building, it is necessary to control the direction of synchronization of the parameters. In the Synchronization area of the configuration of LINEAR Building you can define for each parameter whether and in which direction the respective parameter should be written when the building is detected or updated.
Once you have set the synchronization settings according to your needs, you can save the configuration and set it as the default for all relevant workstations.