General Setting
Explains the concept for general settings regarding the Waste Water pipe network calculation.
Before you start calculating the pipe network after the design, you should make the settings relevant to the calculation in order to achieve realistic results as quickly as possible.
Check the settings for the layers to be included in the detection and decide whether the entire network or only parts of it should be included in the calculation. Set the needed calculation method and building type, adjust default settings for toilets, and set the rainfall rate for your project site.