Drawing in a Dwelling Station
Shows step-by-step how to configure a dwelling station and how to insert it into the drawing.
Before you begin
You want to configure and draw in a dwelling station.
Requirements:
You have a manufacturer data set for a dwelling station.
Navigate to:
In the dwelling station configurator you select the manufacturer and model and enter the requirements for potable water heating and heating. These data are used for pipe network calculations. Then insert the dwelling station into the model.
Applies to: Heating, Potable Water
Procedure
- Click the button Dwelling station.
The Assistant Fresh water and dwelling stations dialog opens.
- Select the manufacturer, the product group and the product.
If you have selected a model including water meter and calorimeter, the Calorimeter and Water meter sections are displayed.
- If necessary, enter the nominal volume flow rates and the pressure losses of the meters.
- Click Potable water ....
The Requirement Potable water dialog opens.
- Enter the requirements for potable water heating and close the dialog by OK.
- If you have selected a model including floor heating, click Floor heating....
The Requirement Floor heating dialog opens.
- Enter the requirements for floor heating and close the dialog by OK.
If the requirements for potable water and heating match the selected model, the dimensioning data are displayed below the product illustration and the Draw < button is activated.
- Click Draw <.
- Place the dwelling station in the model. Tip:
Use the Space bar to rotate the component in 90° steps.
Results
The dwelling station has been configured and inserted in the model.