Jump directly to main navigation Jump directly to content

Checking and Completing General Building Data

Shows step-by-step how to control and complete the building data for your project.

Before you begin

You would like to review the fundamental building data for your project and complete it if necessary.

Navigate to:

Note:

The dialog Building data will open directly after entering a building. Most of the information important for the heat load calculation is transferred with the detection. You can check the building data in this dialog and modify it if necessary.

Module overviewHeat loadProject level

Heat load general building load data Linear Building

Procedure

  1. Enter the building air pressure, if known.
  2. Decide whether to use a simple infiltration calculation.

    The building air pressure is not considered in a simple infiltration calculation.

  3. If necessary, adjust the average supply air temperature.
  4. Check and, if necessary, complete the geometric data on the building dimensions.

    For the calculation of the heat load, the indication of the Floor area A-floor is necessary.

  5. Specify a global heat gain.
  6. Decide whether your building is a standard building or not.

Results

The building data is entered correctly.