Details on Options

Information about the dialog Options in Scheme generator for the trade waste water.

Clicking the Options button opens the dialog of the same name, where you can make presettings for the schema construction.

You are here:

AssistantsTrade / Scheme planningProject setupScheme generator, Waste waterOptions

Connection to waste water pipe run

Determine whether the connections to the waste water pipe run are to be single or double branches. With the setting Automatic, the connection of collector pipes or single connector pipes to the down pipe is carried out without chamfer if possible, i.e. with a 90° angle.

Sewer junction

Select whether the sewer junction is to be placed under the bottom plate or underneath the ceiling of the lowest storey.

Distance between consumers

Set the distance between the consumers.