Jump directly to main navigation Jump directly to content

Details on Switch off Checkbox

Information about the Switch off checkbox in all structure levels of a module.

You are here:

Building StructureStructural levelModule

Activated: The calculations of the current module are performed for the current structural level and for all possibly subordinate structural levels.

Partially activated: The calculations of the current module are performed for the current structural level. For at least one subordinate structural level, the calculation of the current module is switched off.

Deactivated: For at least one subordinate structural level, the calculation of the current module is switched off. Previously entered calculation data is not lost and is available again after activating the calculation.

Note:

If this checkbox is deactivated in the heat load calculation, all affected structural levels are considered unheated in the calculation.