Direkt zur Hauptnavigation springen Direkt zum Inhalt springen

Assigning Pumps

Shows step-by-step how to assign manufacturer pump data to a pump in the model.

Before you begin

You want to assign manufacturer pump data to a pump in the model.

Requirements:

  • The pump exist in the model as a component.

  • You have installed a manufacturer data set containing the appropriate pump data.

Navigate to:

Project tabDisciplineAnalyse tab

Applies to: Heating, Cooling, Potable water.

Analyse tab heating Linear Revit

Procedure

  1. Click Pumps.

    The Pump selection dialog opens.

    Pump selection Linear Revit
  2. Select manufacturer, series and pump model.

    The graph sows the characteristics of the selected model.

  3. Click Assign <.
  4. In the model, select the pumps that are to receive the selected manufacturer data and confirm with Enter.
    Pump on pipe model Linear Revit

    A dialog shows how many pumps have been assigned.

    Notification dialog assign Linear Revit
  5. Close the dialog with OK.

    You will return to the Pump Selection dialog.

Results

The data of the manufacturer pump are assigned to the selected pumps.