Direkt zur Hauptnavigation springen Direkt zum Inhalt springen

Details on Global Presettings for Buffer Storage Dimensioning

Information about the Global presettings for buffer storage dimensioning dialog in pipe network calculation for heating.

In the Dwelling station dialog use the Global presettings function to specify global settings for the dimensioning of buffer storages. The presettings are made for the buffer storage which is inserted as a separate components in the model.

You are here:

Project tabHeating disciplineAnalyse tabDwelling stationGlobal presettings (Buffer storage dimensioning)

Or:

Project tabDiscipline HeatingAnalyse tabSettingsBuffer storage

Global presettings dialog Linear Revit

The calculation is carried out according to AGFW520 Part2. The buffer storage must be contained in the pipe network as a separate component. During calculation, the minimum volume of the buffer storage is determined and transferred to the technical data of the buffer storage.

Note:

It is recommended to increase the minimum volume to the actual volume of the selected manufacturer size after the dimensioning and to repeat the calculation.

Peak hour for tapping

The peak interval for tapping should take at least 10 minutes. The time entered here will act directly proportionally to the size of the dimensioned buffer storage. Double time will lead to a double sized volume.

Available volume

The available volume (thermal usability) of the buffer storage depends on the construction and depends on the position of the temperature sensor and the position of the connections for charging and discharging. If the available volume is only two-thirds, it will lead to a one third bigger buffer size.

Consider supply distribution pipes as buffer capacity

Supply distribution pipes: Pipes leading from the buffer storage to the dwelling stations.

Enabled: The volume of the supply pipes is considered as an additional buffer storage capacity. This will lead to a larger buffer storage volume.

Consider heat losses of the distribution pipes.

Distribution pipe: Pipes leading from the buffer storage to the dwelling stations.

Enabled: The buffer storage volume is calculated slightly larger in order to compensate the heat losses of the distribution pipes.

Only build up stocks for potable water capacities

Enabled: The heat of the buffer storage is only used for potable water heating and not for heating the apartments.

Disabled: The heat of the buffer storage is used for both potable water heating and for heating the apartments. This will lead to a significantly larger buffer storage volume.