Direkt zur Hauptnavigation springen Direkt zum Inhalt springen

Editing Storeys

Shows step-by-step how to edit storeys and work levels.

Before you begin

You want to create, adjust or delete storeys or work levels; you want to change the level type of a level.

Navigate to:

Project tabStoreys ...

Procedure

  1. Click in a field of an existing storey or work level to edit it.
    Note:

    The Absolute Height (mm) column is calculated automatically. The values in this column should only be adjusted manually in exceptional cases.

  2. Right-click on an existing storey or work level to open the context menu.

    Right-click on a level to open the following context menu:

  3. Select the desired action.
    • For work levels, the Storey height field is deactivated. Work levels below a storey level are automatically marked with a negative sign.

    • When converting storey levels to work levels, the value of the storey height is taken as the offset. Conversion in the other direction works in the same way.

Results

The storey and/or work levels are edited.