Direkt zur Hauptnavigation springen Direkt zum Inhalt springen

Details on Levels from Linked Documents

Information on the Levels from linked documents dialog.

In the Import/Synchronize storeys dialog, you can import storeys and levels from a linked model or synchronize with it.

You are here:

Project tabArchitecture discipline Construction tabStoreys ...Import/synchronize

Symbols

Symbol

Meaning

Automatically generated work level to determine the height of the last storey.

Storey level

Work level below another level (e.g. suspended ceiling). The offset to the level above is entered with a negative value.

Work level above another level (e.g. Floor construction).

Linked document

If several files are linked to your model, you can use this drop-down list to specify from which document levels are to be imported.

Only display building storeys

Activated: Hides all work levels.